  • Build a package house

    Build a package house

    Building service stops from A-Z. You only need to check the blueprints, and accept the construction we will perform all stages.

    • Chia sẻ qua viber bài: Build a package house

    PROCESS OF BUILDING PACKAGE PACKAGE

    Step 1: Receive information from customers

    As soon as the customer contacts the Company or sends a request for advice, we will receive the customer's request and advise the customer on the solution.

    Step 2: Conduct a practical survey and contact with the Company's architects and engineers

    - Engineers and Architects will directly meet and collect information related to the work, field surveys.

    - Exchange and capture customer needs, advice on services and construction processes of the company.

    - You refer to the model houses through documents about architecture, the works the company has made, model models.

    - KTS is responsible for introducing to you about services and costs according to the content that you require

    Step 3: Sign the design contract

    - After understanding the capacity and accepting the price list along with the Company's processes. Customers will sign a design contract to proceed to the stages: preliminary design and technical design.

    - Signing contracts with customers

    Step 4: Implementation of Design consultancy with Architects

    - After signing the design contract, the architect will perform the professional work with you.

    - Answering professional questions for customers, the company will provide drawings and instructions for building permits

    - The company will design a preliminary plan: the performance ground and the perspective of the work's facade and adjust according to the investor's opinion (if any) for the investor's approval.

    Step 5:Technical design construction drawings

    After the investor approves the plan of the ground and the perspective of the facade, the Company will deploy construction drawings including architecture, structure, electricity and water and communication system.

    Step 6: Receive the design documents and sign the construction contract

    - After completing the technical design stage, customers perform procedures for handing over documents, and contact the construction consulting department to receive information to prepare for the construction.

    - The cost estimation unit will separate the detailed volume and make a table of construction cost estimates. This estimate is the basis for signing a construction contract.

    - Therefore, very detailed cost estimates help customers can balance materials to suit your financial.

    Step 7: Contract performance and Construction Supervision

    - Preparing human, materials, construction machines and human resources to prepare for construction.

    - Perform construction works in accordance with the content of the contract.

    - During the construction process, the company will provide a monitoring team to serve your works with the following components: Architects, Structural Engineers, Water and Electric Engineers and Ministries other support department

    Step 8: Complete and liquidate the contract

    - Making construction completion documents

    - Minutes of acceptance and handover of the works put into use

    - Liquidation of the contract according to the signed contents

    Step 9: Warranty works

    Perform warranty works in accordance with the contract signed

    The company specializes in architectural design, construction and interior finishing of townhouses, villas, hotels ... please contact us will be consulted by experienced architects.

    The policy is to provide customers with the best construction products and services, the best quality, the most reasonable with the Investor's budget.

    We aim to provide our customers with the best construction products and services, always listening and satisfying customers.

    Service Relate

    menu category

    Loading...

    Service Hot

    Construction And Installation Of Drainage Pipes At Home

    Construction And Installation Of Drainage Pipes At Home

    Instructions for repairing electricity and water at home:

    - Principles of arrangement of pipes and upland fields with drainage covers from inside the project to public sewers or wastewater treatment locations.

    - Principles of arrangement of manholes, visit pits, sewage pits, pits diverting wastewater flow.

    - Principles of arrangement of drainage pipes from septic tanks to public pits or to permeable wells.

    Understand and know the materials for making pipes and constructing drainage ditches when drinking yogurt

    The Botanica Complex

    The Botanica Complex

     Investor: NOVALAND

     Scale: 564 Apartments + 35 Shop houses

     Bidding package: Body structure construction

     Address: 104 Pho Quang, Ward 2, Tan Binh District, City. HCM

     Contract's value: 2,671,637,243 VND

     Date of Completion: July 6 , 2017

    Waste Water Treatment Tank Of Viet Long Hung Garment Factory

    Waste Water Treatment Tank Of Viet Long Hung Garment Factory

     Investor: VIET TIEN GARMENT JOINT STOCK COMPANY

     Scale: Viet Long Hung Garment Factory

     Bidding package: Waste water treatment tank, Capacity 250m3 / day

     Address: Hung Thanh Hamlet, Long Hung Commune, Go Cong Town, Tien Giang Province.

     Contract's value: 6,139,000,000 VND

     Date of Completion: February 3 , 2018